Historic Church Marble Restoration

  • work-in-progress
    Scaffold erected in front and rear of Reredos/High Altar to allow for access to different levels of the structure. Walking were boards needed to be placed from front to back scaffold to reach the top dome area and cross.
  • before-after-angel-wings
    Before and after of angel.
  • before-after-800
    Before and after pictures of the cleaning of the Reredos/High Altar.
  • before-after-700
    Before and after picture of the cleaning of an end post on the Altar railing.
  • before-after-500
    Before and after pictures of the thumb repair on the marble statue of The Blessed Mother Mary. The broken part of her thumb was center drilled at both ends, a small pin was inserted to align the thumb and color matched epoxy to resecure her thumb.

  • Completed repair and cleaning of The Blessed Mother statue.
  • before-after-400
    Before and after picture of the cleaning of one of the marble balusters.
  • before-after-300
    Before and after pictures of the cleaning of one of the side ornaments at Altar sanctuary.
  • 20241023_100414
    A closer up image view.
  • before-after-200
    Before and after picture of the cleaning of the marble cross above the Joseph statue. It was loose and had to be removed, cleaned and reattached.
  • 200
    Close up of the side ornament at the altar sanctuary. The craftsmanship on all of the ornaments is spectacular.
  • before-after-100
    Before and after pictures of the cleaning of the Holy Water stoup.
  • before-600
    Before picture of one of the four altar railings. The area around the railing was carpeted and needed to be protected from the cleaning chemicals and large amount of water needed to clean the marble.
  • after-600
    After picture of one of the four altar railings that was cleaned.
  • baptismal-before
    Before picture of the marble baptismal fountain that was cleaned. The yellowing where the water runs over was due to iron in the water.
  • baptismal-after
    After picture of the cleaning of the marble baptismal fountain. The yellowing was removed where the water runs over, and the entire fountain was cleaned.

Case Study: Restoring the Marble at The Parish Church of St. Joseph the Worker

Background

The Parish Church of St. Joseph the Worker in Williamsport, PA, originally built in 1889 as Annunciation Church, is a 135-year-old structure with a rich history and stunning architectural features. One of the most striking elements of the church is its High Altar and marble flooring, which had suffered wear and tear over decades. Our team was entrusted with the meticulous task of restoring these elements to their former glory. This project was not only a technical challenge but also a source of immense personal satisfaction for everyone involved.

Scope of Work

The restoration project focused on:

Erecting Scaffolding:
  • Accessing the High Altar was one of the first challenges. With only 26 inches of space between the rear wall and the Reredos (the ornamental screen covering the wall at the back of the altar), erecting scaffolding in such a confined area required ingenuity and precision.
  • Additional scaffolding was constructed at the front of the High Altar, and walking boards were used to connect the two sections. This ensured every part of the altar could be safely reached.
Marble Floor Restoration:
  • Locating matching replacement tiles for the marble floor was critical to maintain the historical integrity of the church. After thorough research and sourcing, we found tiles that seamlessly blended with the existing design.
Ornament Repairs:
  • Several of the 5-20lb intricate ornaments adorning the altar had become loose over the years. The risk of these ornaments falling posed a significant threat to the marble and other elements below. Each ornament was carefully reattached to ensure their stability and longevity.
Statue Repairs:
  • The statue of The Blessed Mother required detailed repair work. One of the most delicate tasks was addressing a thumb repair, which involved both structural integrity and perfect color matching to ensure the repair was indistinguishable.

Challenges

  • Confined Space:
    The limited area behind the Reredos required our team to work with extreme care and precision. Transporting materials and erecting scaffolding without damaging the surrounding structures demanded creativity and teamwork.
  • Color Matching:
    Achieving a seamless repair on the statue and sourcing marble tiles that matched the original flooring were both complex tasks that required a blend of technical skill and artistry.
  • Preventing Potential Damage:
    Reattaching the ornaments was a high-stakes endeavor. Each ornament, though small, could cause significant damage if it fell. The team worked meticulously to ensure every piece was securely fastened.

Outcome

The restored High Altar and marble flooring of The Parish Church of St. Joseph the Worker exemplifies the dedication and craftsmanship of our team. The project preserved the church’s historical and spiritual significance while ensuring its beauty for future generations.

The parish community expressed deep gratitude for the work, which brought new life to a cherished space. For our team, the successful completion of this project was more than a professional achievement—it was a profound privilege to contribute to the preservation of a place so deeply valued by its congregation.

Conclusion

Restoring the marble elements at St. Joseph the Worker was a unique and rewarding experience. Despite the challenges, the project showcased the importance of combining technical expertise with a respect for history and heritage. This project not only reinforced our team's commitment to quality restoration but also underscored the importance of maintaining the timeless beauty of sacred spaces.


Do you have marble or other natural stone that needs restoration? CONTACT US to discuss your needs.